We had to fit in as many model rooms as practicable whilst maintaining a mixture of twin, double and universal access facilities.
A change of use application was required as well as working with the City of London Council to agree design and material details for the proposed new building fabric.
The hotel successfully opened in time for Christmas 2015 and is expected to trade in line with occupancy rates set elsewhere in London at above 90%.